Permits and Local Regulations

What to expect from electrical and gas permitting in your city.

Most standby installations require permits and inspections. Expect at least one electrical permit and, in some areas, a gas or zoning permit.

Typical Requirements

  • Load calculation and panel schedule
  • Setback distances for the generator pad
  • Noise limits during testing windows
  • Inspection of transfer switch wiring

How Installers Help

Licensed installers can handle permit submissions and coordinate inspections. Use the local city page to find the right permitting office in your area.

FAQ

Does this guide apply nationwide?

Yes, but local permits and labor rates vary. Pair this guide with the location pages for city-specific details.

What should I bring to an installer quote?

Bring your preferred fuel type, estimated load needs, and any permit requirements you already know.

More cost resources