Permit & Inspection Cost

Permitting, inspection fees, and what affects approval timelines.

Permit cost range

Permit fees vary by city and can include electrical, fuel, and zoning reviews. Most installers bundle permit handling into the labor line item, but costs still scale with scope.

Typical inspection steps

Inspections usually cover electrical connections, gas line testing, and generator pad placement. Some jurisdictions require multiple site visits for gas and electrical sign-off.

What delays approval

  • Missing load calculations or incomplete panel schedules.
  • Incorrect setbacks from property lines or HVAC equipment.
  • Utility requirements for gas meter upgrades or shutoff access.

FAQ

Does this guide apply nationwide?

Yes, but local permits and labor rates vary. Pair this guide with the location pages for city-specific details.

What should I bring to an installer quote?

Bring your preferred fuel type, estimated load needs, and any permit requirements you already know.

More cost resources